E60 highway Zemo Osiauri-Chumateleti

About Project

In Khashuri municipality the construction of the Upper Osiauri-Chumateleti section of E60 highway km7-km14 (Lot 2) is underway since 2021 and is planned to be completed in 2024. A total of 6.4 km road will be constructed. The project includes 11 bridges and 5 tunnels.

This section of the highway is a continuation of Khashuri 13 km bypass, which is already in operation. Khashuri Bypass significantly decreased the traffic in the city. Transit traffic has been completely transferred to the new road. As a result of the opening of the mentioned road, the travel time was reduced by 40-50%.

After the opening of the second section of Zemo Osiauri-Chumateleti, passengers from the north will bypass Surami and Chumateleti and exit at the Rikoti tunnel.

პროექტის შესახებ
Employment
Employment

504 people are employed on the construction of the Zemo Osiauri-Chumateleti section of km7-km14 section, among them 282 are Georgian citizens.

Construction company
Construction company

The construction works of the project are carried out by the international company Sinohydro Corporation Limited.

Funding
Funding

The project is financed by the donor organization, the World Bank, and its budget is 265 million GEL.

Monitoring

The construction works are supervised by the international company IRD ENGINEERING SRL. The supervisory team at the site checks the conformity of the construction materials and performance of the works, conducts the necessary laboratory tests, quality control, checks the compliance of labor and safety during the course of the works, agrees on the construction work methodologies, checks the execution of the work schedules, the volumes of the works performed, studies environmental and social issues. It also prepares monthly reports and approves technical documentation (drawings, engineering reports).